Filming Schedule

This was our filming schedule, made by Gio/Carrick.


No.SceneDateLocationPeoplePropsEquipmentOther
1
1 Church (at convention)
31st August 2024 (Subject to Change)
Hillsong Bali Campus
Giorgio - Director and Cameraman
Fake Pistol
Camera
Microphone
Light
Time to get to location is 1 hour +
Carrick - Actor and Ast. Director
Kaka - Actor
Suit and Tie
Traffic is a big issue
Jaden - Ast. Cameraman
2
2 Interview 1
25th August 2024
Ps. Brian's House
Carrick - Director and Cameraman
Have to adjust around Pastor's work schedules and church schedule
Ps. Brian - Actor
3
3 Interview 2
25th August 2024
Potter's House Bali
Carrick - Director and Cameraman
Have to work around private arrangements and church schedule
Jeremiah Tui - Actor
4
4 Interview 3
25th August 2024
Carrick's House
Carrick - Director and Cameraman
Police Uniform
Ed - Actor
5B Roll 124th August 2024Lapangan RenonGiorgio - Director and Cameraman
Camera
6B Roll 226th August 2024Regents SchoolGiorgio - Director and CameramanAustralian Flag

Self-Reflection: I'm honestly surprised that, for the most part, we were consistent with the schedule, or at least got what we need done on time XD 

These 8-9 weeks of working on the project have felt short. Imagine next term with just 7 weeks...

Tuesday, August 13, 2024

Location Scout & Risk Assesment

In this post I will slect two of our intended locations and determine potential risks that may be involved when shooting there. Credits to Carrick, Kaka, and yours truly.


LOCATION ASSESSMENT
Location:Hillsong Bali Campus
Events in scene:Main event, interviews
Pros of location:easy access, safe and secure, air conditioned
Cons of location:once a week, very far from home
Alternatives:Living World Mall
Jl. Gatot Subroto Timur
https://g.co/kgs/8UYqdnb
RISK ASSESSMENT
Potential hazards:- Overhead projector
- Earthquakes
- Faulty electrical equipment
- Exposed electrical wiring
Evaluate risks:- Projector may fall due to flawed installation
- Earthquakes are unpredictable, which may cause the projector screen to fall over
- Faulty electrical equipment and exposed electrical wiring may cause fatalities to young children and adults
Control measures:- Checked and double checked projector instalment
- Trained participants on the correct Eathquake drill
https://www.ses.vic.gov.au/plan-and-stay-safe/emergencies/earthquake
- Blocked off access to faulty electrical equipment ad exposed wiring
Responsibility:Jaden and Kaka
Time frame:August 20th 2024
Other notes:-



LOCATION ASSESSMENT
Location:Potter's House Bali
Events in scene:Interviews
Pros of location:easy access, safe and secure, air conditioned
Cons of location:once a week, a bit far from home
Alternatives:GPdI Shoshannim Pering
Jl. Segara Willis
https://g.co/kgs/jD1HpkT
RISK ASSESSMENT
Potential hazards:- Overhead projector
- Earthquakes
- Faulty electrical equipment
- Exposed electrical wiring
- Smashed glass from windows or doors
- Stairs being a trip hazard
- Slippery floors due to mopping
Evaluate risks:- Projector may fall due to flawed installation
- Earthquakes are unpredictable, which may cause the projector screen to fall over
- Faulty electrical equipment and exposed electrical wiring may cause fatalities to young children and adults
- Smashed glass will cause cuts and bleeding
- Stairs are a trip hazard to vicually impaired people
- Slippery floors may cause minor or serious injury
Control measures:- Checked and double checked projector instalment
- Trained participants on the correct Eathquake drill
https://www.ses.vic.gov.au/plan-and-stay-safe/emergencies/earthquake
- Blocked off access to faulty electrical equipment ad exposed wiring
- Ensured floor is dry before participants enter
Responsibility:Carrick
Time frame:August 20th 2024
Other notes:-



LOCATION ASSESSMENT
Location:Lapangan Renon
Events in scene:BRolls
Pros of location:easy access, safe and secure, open air, plenty of space
Cons of location:lots of other people making unnecessary noises
Alternatives:Pantai Segara Ayu
Jl. Segara Ayu
https://maps.app.goo.gl/r8CN1zJt35naohPD6
RISK ASSESSMENT
Potential hazards:- Stabbings
- Faulty electrical equipment
- Exposed electrical wiring
- Lightening strike
- Fire hazards
- Falling trees
Evaluate risks:- Stabbings may occur due to open public area
- Faulty electrical equipment and exposed electrical wiring may cause fatalities to young children and adults
- Lightening strikes may cause serious injury and damage to equipment
- Fire hazards may cause serious burns or death
- Falling trees may cause serious injury or death
Control measures:- Requested police presence
- Blocked off access to faulty electrical equipment ad exposed wiring
- Requested fire brigade be on stand-by
- Requested ambulance stand-by
- Ensured all equipment comply with the fire safety code
https://www.qfes.qld.gov.au/safety-education/using-fire-outdoors
- Ensured distance from trees
- Ensured rain not present
Responsibility:Kaka
Time frame:August 20th 2024
Other notes:-


LOCATION ASSESSMENT
Location:Regents Secondary School
Events in scene:BRolls
Pros of location:easy access, safe and secure, open air, plenty of space
Cons of location:lots of other people making unnecessary noises
Alternatives:Regents School Bali
Jl. Badak Agung
https://g.co/kgs/LU3pCys
RISK ASSESSMENT
Potential hazards:- Stabbings
- Faulty electrical equipment
- Exposed electrical wiring
- Lightening strike
- Fire hazards
- Falling trees
Evaluate risks:- Stabbings may occur due to open public area
- Faulty electrical equipment and exposed electrical wiring may cause fatalities to young children and adults
- Lightening strikes may cause serious injury and damage to equipment
- Fire hazards may cause serious burns or death
- Falling trees may cause serious injury or death
Control measures:- Requested police presence
- Blocked off access to faulty electrical equipment ad exposed wiring
- Requested fire brigade be on stand-by
- Requested ambulance stand-by
- Ensured all equipment comply with the fire safety code
https://www.qfes.qld.gov.au/safety-education/using-fire-outdoors
- Ensured distance from trees
- Ensured rain not present
Responsibility:Kaka
Time frame:August 20th 2024
Other notes:-


LOCATION ASSESSMENT
Location:Brian's House
Events in scene:Interviews
Pros of location:easy access, safe and secure
Cons of location:limited working space, lighting may be insufficient
Alternatives:Carrick's House
Jl. Permata Pering
https://maps.app.goo.gl/qMky2i7mLwkuTHPz5
RISK ASSESSMENT
Potential hazards:- Earthquakes
- Faulty electrical equipment
- Exposed electrical wiring
- Smashed glass from windows or doors
- Stairs being a trip hazard
- Slippery floors due to mopping
Evaluate risks:- Earthquakes are unpredictable, which may cause the projector screen to fall over
- Faulty electrical equipment and exposed electrical wiring may cause fatalities to young children and adults
- Smashed glass will cause cuts and bleeding
- Stairs are a trip hazard to vicually impaired people
- Slippery floors may cause minor or serious injury
Control measures:- Trained participants on the correct Eathquake drill https://www.ses.vic.gov.au/plan-and-stay-safe/emergencies/earthquake
- Blocked off access to faulty electrical equipment ad exposed wiring
- Ensured floor is dry before participants enter
Responsibility:Carrick
Time frame:August 20th 2024
Other notes:-


LOCATION ASSESSMENT
Location:Carrick's House
Events in scene:Interviews
Pros of location:easy access, safe and secure
Cons of location:limited working space, lighting may be insufficient
Alternatives:Brian's House
Jl. Sekuta
https://maps.app.goo.gl/vw4QN59uYryzJbjs7
RISK ASSESSMENT
Potential hazards:- Earthquakes
- Faulty electrical equipment
- Exposed electrical wiring
- Smashed glass from windows or doors
- Stairs being a trip hazard
- Slippery floors due to mopping
Evaluate risks:- Earthquakes are unpredictable, which may cause the projector screen to fall over
- Faulty electrical equipment and exposed electrical wiring may cause fatalities to young children and adults
- Smashed glass will cause cuts and bleeding
- Stairs are a trip hazard to vicually impaired people
- Slippery floors may cause minor or serious injury
Control measures:- Trained participants on the correct Eathquake drill https://www.ses.vic.gov.au/plan-and-stay-safe/emergencies/earthquake
- Blocked off access to faulty electrical equipment ad exposed wiring
- Ensured floor is dry before participants enter
Responsibility:Carrick
Time frame:August 20th 2024
Other notes:-


Self-Reflection: While me and Kaka only contributed to one of the buildings, it was also the main one we used anyways, so it feels like a job well done. I guess it was fun to document the pros & cons of the facility, as if were some serious, high standard company.